Povej prijatelju o tem izdelku:
Construction Scheduling with Suretrak 3.0 Dr. Mohamed Hegab
Construction Scheduling with Suretrak 3.0
Dr. Mohamed Hegab
The book covers the use of the SureTrak® software in easy format by walking through the software in a way similar to the practical use of the software which makes it easy to apply. It has project examples which allow user to grasp the concept and us the software efficiently. SureTrak® is planning and scheduling software that is trademarked and owned by Oracle that can be used in any industry including building, construction, oil & gas and software development.
| Medij | Knjige Paperback Book (Knjiga z mehkimi platnicami in lepljenim hrbtom) |
| Izdano | 1. februarja 2011 |
| ISBN13 | 9781456433123 |
| Založniki | CreateSpace Independent Publishing Platf |
| Strani | 188 |
| Dimenzije | 10 × 203 × 254 mm · 385 g |
| Jezik | Angleščina |
Ogled vseh Dr. Mohamed Hegab
Božična darila lahko vrnete do 31. januarja